“Smaller contractors who tender on a cost per square metre basis puts both themselves and their clients at risk,” van den Heever adds. “We have, on numerous occasions, been approached by clients or their attorneys when building contracts turn sour, only to find that because there was no detailed breakdown of the costs, the project had run into trouble or came to a standstill due to overpayments on the structural elements.”
A “cost per square metre rate” is a method of expressing building costs that should be used with extreme caution by clients and contractors, says Bert van den Heever, former president of the Association of South African Quantity Surveyors. He explains that there are a number of design variables which can adversely influence square metre rates, thereby giving a false impression of the cost of a building project – this can lead to serious problems for both clients and contractors, van den Heever says. “You will not compare a Porsche to a Volkswagen on the basis of their cost per square metre, so why try and do it with buildings,” he asks. “As a client, a generic cost per square metre rate doesn’t give you the detailed information that you need regarding finishes, fittings, services, site development costs, etc. There is a wide range of other building elements that also have an impact on costs and therefore, quantity surveyors normally do elemental estimates to derive the square meter cost of a project.” He explains that an elemental estimate provides cost build-ups for elements such as the substructure, ground floor, external façade, roofs, and enables the quantity surveyor to advise the client on aspects of cost at a very early stage. “It is important to note that less than 40% of a building’s cost is the structure itself, so the project is far from completed once the foundation has been laid, the walls have been built and the roof constructed,” he says.